| Acronym |
GEM - 2 |
| Main objective |
2nd Phase of the International Galactic Emission Mapping at Portugal.
- test and installation of the 2.3GHz total power radiometer assembled in Brazil (by Marco bersannelli, Deputy-PI of Planck Surveyor sattellite) to complete the 2.3 GHz North Hemisphere survey in S-band
- Calibration with cold load/hot load of the C-band correlator; calibration and first-light fo the polarimeter receiver.
Overal: production of the first digital complex base-band cross-correllator using FPGA chips applyed to radioastronomy surveys.
|
| Reference |
PTDC/CTE-AST/65925/2006 |
| Name |
Polarimetry Instrumentation for a Galactic Survey at 2.3-10GHz |
| URL |
Click here |
| Funding |
FCT/PTDC |
| Start date |
01-07-2007 |
| Ending date |
01-07-2010 |
| Team |
Domingos da Silva Barbosa ; Dinis Gomes de Magalhães dos Santos ; Rui Miguel Afonso Gomes da Fonseca |
| Groups |
Integrated Circuits – Av |
| Partners |
CENTRA - Instituto Superior Técnico; Instituto Nacional de Pesquisas Espaciais do Brazil; Lawrence Berkeley National Laboratory - University of California , Berkeley |
| Local coordinator |
Domingos da Silva Barbosa |
| Other contributers |
--- |